Peak+, a developer and manufacturer of precision adiabatic pre-cooling technologies that enhance air-cooled condenser performance and operational reliability, has recently launched its Peak+ CORE pre-cooling system. This new system integrates directly into air-cooled chillers and other air-cooled equipment and supports factory installation.
Higher power densities in data center campuses mean greater challenges for facility heat rejection, evidenced by increasingly common failing external CFDs. The CORE system is specifically designed for high-temperature environments, where it is critical to suppress Condenser Entering Air Temperatures (CEAT) to the chiller system design temperature, or below, to avoid chiller performance derate.
As with all Peak+ adiabatic pre-cooling systems, CORE can achieve and maintain a specific targeted cooled dry bulb CEAT, enabling operators to minimize water use.
Commenting on the development, Chris Curry, CEO at Peak+, said, “Data centers of all sizes are facing the same pressures: more heat, higher opportunity costs of misused energy, and increasing focus on water stewardship. The Peak+ CORE system is what the market has been asking for – factory-installable, precise, and robust adiabatic pre-cooling – whether that is a new construction project or an existing facility looking to upgrade.”
The CORE system is designed to meet the needs of air-cooled chiller OEMs and data center operators and can be installed at the OEM factory or at off-site pre-fab facilities, minimizing on-site assembly and integration work.